Paving / Roadwork Notice
Front Street will be CLOSED starting Wednesday, September 4th, 2024 thru Friday, September 6th, 2024 (weather permitting) for paving work. The roadway will be closed daily from 7am – 5pm with a barricade containing a road closed sign and cones at each end. Residents that live on Front Street are being asked to remove their vehicles from the street before September 4th and park along Main or High Streets during those three days. Additionally, a speed bump will be installed on Friday, September 6th, 2024 on High Street between Fourth and Fifth Streets. Residents that live on that length of High Street will have limited access to the street during milling and paving operations.